Case Studies
Garbage Facility
Check out what ClearBlu can do to help in the Garbage Facility business.
Background
A large regional garbage company needed a wash system for their 100 truck fleet, not only to wash the trucks, but also the engines, hydraulics, all commercial garbage dumpsters, and cans. They wash 24 hours a day. They have no sewer access, so the water had to be fully reclaimed.
Solution
With a huge organics and oil and grease load, the system supplies unlimited wash hours with fresh-smelling water. All grease and oil are eliminated and the organic sludge load has been reduced by 90%.
CONTACT US
TALK WITH AN EXPERT
We have a cost-effective and environmentally friendly solution for operations of all shapes and sizes in the United States.
Contact Us – Sidebar
related CASE STUDIES
Heavy Equipment
Project Type: Primary Treatment
Equipment: Settling Tanks; Wastewater Aeration; Biodigesters; Microbes;
Learn More
RDO Equipment
Project Type: Primary Treatment
Equipment: Settling Tanks; Biodigesters; Wastewater Aeration;
Learn More
CONVENIENT LOCATIONS
Serving Companies Nationally
With locations in California, Colorado, and Oregon, we are able to provide wastewater treatment solutions across the United States.